| St. Catherine's Hospital Expansion |
| Location: |
Scope of Contract: |
| Pleasant Prairie, WI |
Taping and finishing, painting and wall covering,
EIFS Brick. |
| Architect: |
|
Welman Architects, Inc.
|
| General Contractor: |
Contract Size: |
| Riley Construction |
1,500,000.00-2,000.000.00 |
| Description of Project: |
Major Challenge: |
|
Addition of a 3rd and 4th floor to the existing hospital.
Addition and renovations of the emergency department. Imaging
and mechanical penthouses.
|
The original plans called for a cement coat and veneer brick
exterior cladding on the 5th floor penthouse and courtyard
areas. We worked together with Ben Kossow from Riley Construction
to design the EIFS brick system and perform the installation
that would match the existing brick colors on the old hospital
lower floors.
|
| |