| Garlands - Barrington Ill. |
| Location: |
Scope of Contract: |
| Barrington, Ill. |
240,000 Sq.Ft. addition to an existing
senior living facility in Barrington, Ill. |
| Architect: |
|
|
| General Contractor: |
Contract Size: |
| Pepper Construction |
$7,000,000.00 |
| Description of Project: |
Major Challenge: |
|
Olympic has hired Infinty Structures out of Georgia to supply
the stuctural design and engineering for the structural stud
wall panels and metal decking on the project. Infinity will
also supply all of the structural stud wall panels and the
Epicore metal deck. Olympic will provide the labor to install
all of the Inifinity Stud Panels. We are also responsible
for the design and installation of the metal deck and concrete
shoring. We have hired Doka Systems to provide the shoring
design. Olympic is also providing the labor to install and
remove all of the Doka shoring which we are renting from Doka.
|
Although this is a little outside of our normal work, our
Olympic Carpenters have adapted well and are doing an outstanding
job setting all of the shoring. The final step in our contract
is to install 2 layers of sheathing on the outside of all
the structural stud panels. This work started in May is going
very well thus far. We have found a great partner in Infinity
Structures and we hope for more oppurtunities to work together
as this has been a very successful project thus far.
|
| |
| click picture for larger view, close picture window