| aloft Hotel |
| Location: |
Scope of Contract: |
| Minneapolis, MN |
Interior and exterior steel stud framing, insulation,
gypsum board, taping/sanding, sprayed fireproofing, direct applied
acrylic finish system. |
| Architect: |
ESG
|
| General Contractor: |
Contract Size: |
| Bor-Son Construction |
$1,450,000.00 |
| Description of Project: |
Major Challenge: |
New 5 story, 155 unit Starwood Hotel in Downtown Minneapolis.
|
Framing uni-strut/stud suspended ceiling on majority of
first floor. Numerous openings/coordination. Ceiling above
was exposed.
|
| |
| click picture for larger view, close picture window by pressing 'Esc' |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|